0-60 days
Evidence hardening
Turn literature-backed claims into a ranked validation register.
- Claim register
- Source quality score
- Baseline AD comparison
- Open measurement list
Execution Plan
A phase board for moving from evidence synthesis to bench validation, integrated economics, site pilot design, and scale-up decision.
0-60 days
Turn literature-backed claims into a ranked validation register.
2-4 months
Measure feed variability, HTL conversion, and initial product quality under controlled conditions.
3-5 months
Connect HTL, anaerobic digestion, hydrotreating, aqueous phase treatment, and carbon intensity in one ledger.
5-9 months
Prepare a wastewater-site pilot that tests equipment, sidestreams, permitting, and operations together.
9-12 months
Decide whether to stop, revise, or fund a larger field demonstration.